Lights
Outside
Side goals
Pull-outs
Flag
Crowd
Quality
A crowd and Full quality are heavier on phones. Quality reloads the gym.
Drag to look around
01 / 15
Built by the community
The Whole Gym
About 500 people bought $5 shares in the building corporation formed in 1954 to pay for it. Construction began in March 1955, to a design by architect W. Erb Hanson, and the building cost $560,480.83, equipment included.
It was dedicated on Tuesday, Nov. 20, 1956, before a crowd of 3,000.
i1053.comWASD or arrow keys to walk · Shift to hurry · drag to look
